How time flies, more small, time consuming jobs done:
stripped down the intake side:
HMMMMM:
welds are not 100% penetration, bits chipped out when drilled

all the holes are not even inline, or 100% on intake flow, some 30% covered by the gasket!!! so much for a pro job!!
The correct amount of pedals.

can someone remind me which side the flippy conector bit goes, up or down???
Pedal has been re-drilled so choice of 5.75 or 7.4 pedal ratio.
steering box back in, it didnt need any adjustment, no play at all now thanks to all new joints.
a Few home made brackets to tidy and relocate
the old master was relocated and rotated to fit best on the remote servo style pedal box. spaced 2.5mm at top to adjust angle to match the pedal.
view from above
trying to use space wisely.
Box of spares still to use.
Lots on order
10m of black braided 6an fuel line
044 fuel pump
facet red top
aeromotive fpr with gauge and black fittings
6an 100micron filter
various fittings and clamps for fuel system and front brake lines.
Bought a DTA P8PRO ecu as well. Handy its motronic 55 pin so might be able to recycle some of the 2x harnesses.
all line will be run inside the car.
surge tank and pumps will be mounted and sound proofed in spare wheel well.