more things done.
boot fuel install

not screwed or clamped yet, they are in the post.
2 signal cabled for 2 stage pumps.
battery bolted down and a few holes drilled, just need rubber grommets fitted.
fuel lines and battery cable routing
space for second supply line if required.
bulkhead fittings and RTV curing for main power cable.

these lovlees arrived from vibrotechnics
s38 oil housing

oil cooler temp switch and supply for turbo, yes please.

One MR Holset HE531v turbo, mmmmmmm, shaft speed sensor might come in handy, looks like 3 pin hall effect type sensor.
while looking for a rebuild kit, I found a brand new one for not much more so that will be installed instead.
just to compare to a T25, exhaust housing varies from 16 to 31 cm will be controlled using the DTA ECU with pwm vacuum valve tps, vs rpm possibly second valve on second map to include exhaust MAP pressure sensing.
a "GOODNTIGHT" copy manifold from germany i am sure not as nice as his, it came with 2yr crack warrenty, but i couldnt have made this for the price i paid so worth a punt and dont mind chopping and altering if required. waste gate will prob be blanked.
see his car here, i love it.
http://www.mye28.com/viewtopic.php?f=6&t=39675
you can see its not seamless tubing and not 100% penetration, so i am taking bets on how long it will last.
someone has been in here before, rods are numbered.
dual valve springs have been fitted.
managed to get a M5 5kg fly wheel so a Sachs 765 plate and PPF sintered disc will be ordered, rated to 800nm.
slight corrosion on the bore, if it does not hone out will be bored locally, then i need to decide if i can afford forged pistons.
front pully hub needs the extra dowel mod
clean clean and clean.
PPF Z55 crank looks good
double springs
alloy lockers
HD rockers
coopering or cometic gasket
ARP all round
that should be me good 'n' safe, I hope.