basically new baby+ 3yr old+ lots of rain and i lost intrest in working in the cold.
so what was achieved?
Im quite pleased with the progress and proud of my work plus with a 15% reduction in headcount at work, i may be touting for work!

build stud chimney breast and installed electric fire and micro marble fire place then first attempt at papering either side

Got brave and decided to paper the whole dining room wall

Got stuck in and completed the downstairs bathroom, 1900x900 12 jet bath Ebay £600 tested for first time tonight by Me and Mrs


Had to redo all the plumbing and drains, made the unit from scratch, 40mm worktop, 40x40 oak spindles, 3 coats of Mylands water based clear matt laquer

The whole floor is reinforced, membrane tanked, 600x600 porcelain tiles, wet floor shower with level access gradiated floor, tanked walls.

wall tiles are 400x100 split face oyster, easy to lay on flat surfaces, but lots of cutting arount edges, Not ideal or really practical for the shower, and very dificult to grout well but it will hardly be used.
Extraction is the LED light chrome vent, alloy ducting with large 250m3/Hr axial inline timed fan.
window was clad with £40 190x22mm oak door facing then varnished with more Mylands, I recommend this stuff, has virtually no gloss and hardly changes the natural colour of the wood, good for trying to match stuff together.
Still to get a glass shower screen, but thats it.
Total cost...........£4200.00 Materials Only.
Now I have no excuses not to work on the cars, been gathering bits for the E12 as well.